Decade International Provide Radio (Walkie Talkie) to this project. Our handy sets covered upper and lower directly. After setup repeater and hand set we got the very positive message from the client.
Himalaya Urja Bikas Company Ltd. was established on 2056 B.S. as a private limited company by a highly esteemed team of Professionals. It was converted into public Limited Company on 17th Kartik, 2071. With an aim to foster potential hydropower sector of Nepal, our company is involved in developing two Hydropower projects of Nepal: Upallo Khimti Hydropower Project, 12 MW & Upper Khimti-II Hydropower Project, 7 MW over Khimti Khola situated in Chhuchure V.D.C of Ramechhap District. The Company has completed financial closure and it is now under the construction phase. Currently both the projects are going under construction with an aim to accomplish the construction of both the projects within two years. Our central office located in Subhidanagar, Tinkune, Kathmanandu is easily accessible and is open during office hours.
Decade International Provide Radio (Walkie Talkie) to this project. Our handy sets covered upper and lower directly. After setup repeater and hand set we got the very positive message from the client.